GENERAL DIRECTORATE OF TURKISH STATE RAILWAYS
ARIFIYE-PAMUKOVA SECTION 2nd LINE RAILWAY COMPLEMENTARY WORK
FIRST CONTRACT VALUE: 59.447.281 TL
Incomplete works outside the line platform in KP 140+100- KP 157+300 section; incomplete works on and outside the line platform in KP: 158+300-KP 167+500 section and all excavation, filling, surrounding wall, bridge, culvert construction -including line platform and engineering structures- and works of railway superstructure in KP 158+300-KP 167+500 section are included in the scope of work.
An accelerated renovation has been carried out at Arifiye Pamukova stations in Arifiye-Inonu single track line section with an approximate length of 150 km on the existing conventional line between Ankara-Istanbul. This line has an economical importance.
Briefly, Ankara-Istanbul high-speed line project will contribute to the renovation and doubling the tracks of a section of the existing conventional line.
Within this project, TUR INSAAT has successfully completed the rehabilitation of the existing railway line and construction works of surrounding wall, culvert, engineering structures and railway superstructure.