STREICHER-HAUSTADT&TIMMERMAN-GUNSAYIL- ALARKO JOINT VENTURE
BAKU TBILISI CEYHAN CRUDE OIL PIPELINE PROJECT AND BLOCK VALVE STATIONS EXCAVATION, FILLING, PIPE CULVERT AND DRAINAGE PIPE INSTALLATION AND CONSTRUCTION WORKS LOT B
CONTRACT VALUE: 5.017.010,97 TL
Baku-Tbilisi-Ceyhan (BTC) Pipeline is a 1.768 km-long petroleum pipeline which transports the petroleum from the Sangacal terminal near Azerbaijan-Baku and passing through Azerbaijan, Georgia, Turkey to the Ceyhan marine terminal on the shore of the Mediterranean Sea.
The pipeline buried in the entire full-length of the project (total length is 1.768) and the construction of which started with an ground breaking ceremony on 17 September 2002 with the participation of the leaders of the administrations of the related countries in Azerbaijan’s Sangacal district, has 249 km located in Georgia, 443 km in Azerbaijan and 1.076 km in Turkey. Since it is estimated that Turkey will be 65-70% dependent on Russia in natural gas consumption, Turkey is in alternative searches about energy lines and in case the cost of the construction of the BTC pipeline within its own boundaries exceeds 1,4 billion dollars, Turkey has undertaken to pay for the amount above this limit.
The total length of the BTC petroleum pipeline in Turkey is 1.075.366 m. This line was completed with a total of 15.580.540 m3 excavation, 8.313.622m3 filling, 112.000 m3 concrete performed by 12.074 people and was commissioned in 2006.
In this project, Tur Insaat has successfully completed the works of Excavation, Filling, filling with borrowed material, filling with River Aggregate material and installation of pipe culvert and drainage pipes.